TG Tunnelling is supporting Align, a joint venture of three major infrastructure companies that it is delivering the Central 1 portion of HS2, that includes a 16km twin-bored tunnel through the Chiltern Hills.
‘Well done to Damien Oslos who is doing a fantastic job with the installation of the surface slurry pipework and has been noted by the TG Tunnelling site team and the Align management team’
Presenting the award is Andy Birch (ALIGN Deputy Plant Manager) and Gerry Hennelly (TGTunnelling Contract Manager).
Leave a Reply