TG Tunnelling is supporting Align, a joint venture of three major infrastructure companies that it is delivering the Central 1 portion of HS2, That includes a 16km twin-bored tunnel through the Chiltern Hills.
‘Well done to our Crane Supervisor Dan Harris who has been doing an excellent job working with the assembly of the TBM Gantries and has been noted by the TG Tunnelling site team and the Align management team’
Presenting the award is David Rodriguez (ALIGN Plant Manager) and Ben Ely (TGTunnelling Contractor Manager).
Leave a Reply