TG Tunnelling is supporting Align, a joint venture of three major infrastructure companies that it is delivering the Central 1 portion of HS2, that includes a 16km twin-bored tunnel through the Chiltern Hills
‘Well done to Andrea Boianu whose excellent attitude at work has been noted by the TG Tunnelling site team and the Align management team’
Andrea is a slinger signaller on the TBM assembly build and is keen to further her career by working on the TBM once tunnelling commences in May this year.
Presenting the award is Richard Cross (ALIGN Lifting Manager – Lifting Operations) and Paula Micaelo (TG tunnelling General Manager).
#ALIGN #HS2 #womeninconstruction #team #TGTunnelling
Leave a Reply